Semiconductors
Data Center Memory Shortage 2026: Why SSDs Pay for HBM
Enterprise SSD revenue doubled in 2Q26 as memory makers moved fab lines from NAND to DRAM and HBM. Why storage, not GPUs, takes the hit into…
What it takes to run AI at scale: the price of a token, the power a training run pulls from the grid, and the chips, memory and cooling that set the limits. Every piece is sourced, and the tools below let you check the numbers.
Updated
Flagship analysis
Cheap tokens may do for AI what cheap credit did for start-ups. Taken apart, a token's cost depends heavily on how long a chip lasts and how busy it is.
Read the analysis: The interest rate of intelligence: what sets the price of an AI token
Carbon-aware computing in Europe: what shifting load savesShifting flexible compute to cleaner hours cuts reported emissions, but the saving depends on country, window and signal.… · 13 min read
Cosmic Rays and Silent Data Corruption in Data CentresCosmic-ray neutrons are real, but field studies point to hardware defects behind most DRAM faults and the silent… · 16 min read
AI Energy Per Query: Same Prompt, Two Different NumbersAI energy per query differs 2.4x for the same median prompt depending on method, and the popular figure… · 7 min readFree tools built on the same data as the analysis, updated as the sources change.
Every analysis here starts from one question. Open it for the short answer, then read the full piece.
At 1 MW a 54 V rack draws 18,519 A and an 800 V DC rack 1,250 A. Worked copper figures, EU rules, DC protection and hardware dates.
Read: 800V DC Power for 1 MW Server Racks: Copper, Safety, EU RulesAI model collapse comes from uncurated synthetic data, and the text shortage only pushes labs toward it.
Read: AI Model Collapse Is a Curation FailureLocal opposition blocked or delayed $130 billion of US data-center projects in Q1 2026.
Read: Data Center Opposition Is Now America’s Real AI BottleneckPhantom data center power demand is padding PJM's capacity auction, and ordinary households are paying for gigawatts that will never get built.
Read: Phantom Data Center Power Demand Is Raising Your BillSamsung and Mousterian have a 50 MW floating data centre engineering deal.
Read: Samsung’s Floating Data Center: 50 MW, Permits UnsettledTexas data center audit freezes AI project approvals, the friendliest state to hyperscalers just turned the brake on its own boom.
Read: Texas Data Center Audit Freezes the AI Boom’s Friendliest StateThe OpenAI Nvidia Ohio data center deal has Nvidia funding its own customer's $500B lease, demand, or a hall of mirrors?
Read: OpenAI Nvidia Ohio Data Center Deal: Real Demand?Data center financial assurance requirements just turned AI buildouts into a credit-risk problem, and states are picking very different sides.
Read: Data Center Financial Assurance Requirements Split StatesMore on AI infrastructure, newest first.
Semiconductors
Enterprise SSD revenue doubled in 2Q26 as memory makers moved fab lines from NAND to DRAM and HBM. Why storage, not GPUs, takes the hit into…
Grid Interconnection
The AI data center power bottleneck, not chips, is 2026's real ceiling: grid queues, 150 kW racks, and water now decide who wins.
Co-Packaged Optics
Everyone is cheering co-packaged optics for saving power. They are missing the real story: the pluggable transceiver, the most-swapped part in any AI data center, is…
Power Grid
The AI data center boom has officially gone parabolic: global spending is crossing the $1 trillion mark in 2026, power demand is set to double, and…
Power, cooling, compute and the software that runs on them. One sourced brief a week.