
Vela Incident: Why a Perfect Detector Still Divides Scientists
The Vela Incident's bhangmeter was 41-for-41 on real nukes before 1979's double flash. Its optics, more than the spies, keep the case disputed.
Step 1 · Plan
Build your multi-year plan
Site, grid, costs, revenue and returns in one case.
Start a new planOpen my workspace Business Case Premium Market figures with low and high for every market in the plan.Step 2 · Build
Design the build and its cost
From your design basis: the long-lead plant to order first and the fit-out, then every line with its cost and vendors.
Build your data centreBusiness Case Premium Prices, ranges, EUR per kW, scenarios and saved estimates.Step 3 · Operate
Work out what running it costs
Energy, and the operating cost: staff, security, building services, maintenance and the rest.
Measure your operating costBusiness Case Premium Prices, ranges, scenarios and saved projects.Running costs
Step 4 · Compliance
Get compliance under control
Which rules apply, what is due, where the gaps are.
Track your complianceScienceShot Compliance Every programme across your sites, on one board.Indicators
Step 5 · Sell
See what it sells for
Price, fill and contract terms, as scenarios.
Price your capacityBusiness Case Premium Ranges, EUR per kW and every market behind the market pages.Revenue
Intelligence

The Vela Incident's bhangmeter was 41-for-41 on real nukes before 1979's double flash. Its optics, more than the spies, keep the case disputed.

Challenger's coldest prior flight had its O-rings at 53°F. On launch day the failed joint was estimated at 28°F, about 25 degrees colder.

Thomas Midgley's leaded gasoline beat ethanol because it could be patented. Better combustion chemistry had little to do with it.

At 1 MW a 54 V rack draws 18,519 A and an 800 V DC rack 1,250 A. Worked copper figures, EU rules, DC protection and hardware dates.

Quantum error correction threshold theorem: why Google's Willow gets more reliable as it scales, while near-threshold chips don't.

Phantom data center power demand is padding PJM's capacity auction — and ordinary households are paying for gigawatts that will never get built.

Intel's glass core substrate is not in Clearwater Forest, which uses organic substrate and EMIB. What ECTC 2026 showed, and why glass is years away.

Samsung and Mousterian have a 50 MW floating data centre engineering deal. Site, power and approvals remain unresolved; shipyard fabrication may still shorten delivery.

Texas data center audit freezes AI project approvals — the friendliest state to hyperscalers just turned the brake on its own boom.

GitHub Copilot code review's new Agent Skills and MCP support went GA on July 29 — and it quietly hands PR governance to whoever runs the skill server.

Power, not GPUs, sets the schedule for an AI data center. What 10 MW of IT load holds at today's rack ratings, and the published grid waits in the US and Europe.

Everyone's cheering GPT-5.6 Sol's 750 tokens per second. They're missing it: wafer-scale inference means OpenAI is quietly retiring the GPU cluster for its frontier model, and rewriting the physics of the AI data center.