Step 1 · Plan · view 2 of 4

Where to build power, generation and fibre on one map

Click a place or pick a market: the grid connection status and published wait, the power plants nearby, the distance to the transmission grid and to fibre, the round trip to the main hubs and the electricity bill, in plain words.

Grid connections checked 12 Oct 20262,377 power plants, 23,497 substations, 9,162 grid lines, 12,215 fibre routesPrices excluding VAT

Where to build?

Click the map or pick a market.

Substations, transmission grid and data centres © OpenStreetMap contributors

Every country at a glance

The status of new grid connections for large loads and the published wait, from the grid connection tracker, with the all-in business electricity price.

Grid connections and electricity price by country
CountryNew connectionsPublished waitAll-in price, €/MWh
AustriaOpenNone published€188
BelgiumConditionalNone published€149
CzechiaConditional in parts5–15 years€233
DenmarkRationed5–10 years€176
FinlandConditional in partsNone published€59
FranceOpen2028–2029€92
GermanyRationed2030–2036€216
IrelandConditionalNone published€202
ItalyOpenNone published€172
NetherlandsRationed in parts2034–2037€165
NorwayPaused in partsNone published€57
PolandCongestedNone published€233
PortugalRationedNone published€128
SpainRationed in partsNone published€126
SwedenCongested in parts1–5 years€89
SwitzerlandOpen3–10 years€99 (wholesale)
United KingdomPausedNone published€94 (wholesale)

How to read the verdict

Screening figures for a first shortlist, not a connection offer.

Power

The worst rule in force for new connections in the country (paused, rationed, conditional or congested) and the published connection wait, from system operators, regulators and ministries. “In parts” means the rule or wait covers part of the country only.

Substation

Straight-line distance to the nearest substation of 220 kV or more, and of 110 kV or more, with a voltage tag in OpenStreetMap, retrieved . Within 10 km reads as close, 10 to 30 km as a line to plan, beyond 30 km as far. Untagged substations are left out, and no capacity is known.

Generation

Power plants of 50 MW or more within 50 km, their total capacity and the two largest fuels. A large plant nearby usually means a strong substation, not spare capacity for you.

Connectivity

Straight-line distance to the nearest mapped transmission line (220 kV or more) and operational fibre route. Round trips use the straight line times 1.13, the median of our 169 mapped fibre routes between hubs, at the speed of light in fibre: real latency is higher.

Cost

The annual electricity of your IT load at 60% utilisation, with a PUE adjusted for the country’s cooling degree days, at the all-in business price (wholesale where no full bill is published). “Now” is the latest day-ahead price and grid carbon of the bidding zone.

Sources: grid connection tracker, checked (system operators, regulators and ministries); Eurostat electricity prices, compiled ; ENTSO-E day-ahead prices and generation, live; ITU transmission networks, retrieved . Map data: power plants from the Global Power Plant Database (CC BY 4.0), ; substations (retrieved ), transmission grid and data centres © OpenStreetMap contributors (ODbL); outlines Natural Earth.

ScienceShot calculation.

Cite this page

ScienceShot. (2026). Site finder: where to build a data centre [Online calculator]. https://scienceshot.com/plan/site-finder

@misc{scienceshot-site-finder-2026,
  author = {{ScienceShot}},
  title  = {{Site finder: where to build a data centre}},
  year   = {2026},
  note   = {Online calculator},
  url    = {https://scienceshot.com/plan/site-finder}
}