Design the build, long-lead plant and fit-out
Set the design basis once. The IT load, cooling, redundancy and spec level size every package, split into the long-lead plant you order first and the fit-out, with lead times and order-by dates.
Sign in to save this into your project. One project is free; Premium keeps up to 25 and saves scenarios.
Sign inDesign basis
Skip to the scheduleSite model
Long-lead: UPS, generators, transformers, MV switchgear, chillersFit-out and building
ScienceShot calculation.