Data-centre rules

Data centre regulation in the Netherlands

Our tracker lists 8 rules for building and running a data centre in the Netherlands, national and EU, and 5 of them are in force.

Each comes with its status, who it applies to and the next date that matters. When a rule here changes, the change is logged below with its date.

8 rules5 in force

Rules that apply in the Netherlands

National rules first, then the EU rules every member state applies. Status as on the tracker.

RuleLevelStatusApplies toNext date
Bkl instruction rule, Staatsblad 2023, 492NationalIn forceNew sites. Hyperscale data centres: built floor area above 10 ha and electrical connection capacity of 70 MW or more (both required). Omgevingsplannen may not allow them anywhere in the Netherlands except designated sites in Het Hogeland (Eemshaven) and Hollands Kroon (Agriport A7, Middenmeer area). Not applicable where a building permit already allows the activity.Autumn 2026: national integrated data-centre approach, which explores tightening the criteria; no date published
Bal paragraph 5.4.1a, arts 5.16a to 5.16c (Staatsblad 2024, 122): energy-efficiency data of data centres (EED Art. 12)NationalIn force since 7 May 2024New and existing sites. Operators of data centres with installed IT power of at least 500 kW; defence and disaster-response data centres exempt15 May each year, next 15 May 2027
EED reporting, Article 12 and Delegated Regulation 2024/1364EUIn forceNew and existing sites. Data centres ≥500 kW installed IT power15 May 2027, next annual report
EED waste heat, Article 26(6)EUIn forceNew and existing sites. Data centres >1 MW total rated energy inputOngoing duty
EED energy management systems, Article 11EUIn force as a Directive duty on Member States; deadline not yet reachedEnterprises, including data-centre operators, with average annual energy consumption above 85 TJ (23.6 GWh) over the previous three years, all energy carriers together11 October 2027, certified energy management system in place
EU rating scheme, delegated regulation adopted 21 Sep 2026EUAdopted, in Parliament and Council scrutinyNew and existing sites. Same ≥500 kW reporting populationIn force 20 days after Official Journal publication, if not objected to
EU minimum performance standardsEUConsultation openNot yet defined14 December 2026, consultation closes
Cloud and AI Development Act, COM(2026) 502EUProposal, with Parliament and CouncilCloud and AI infrastructure providers broadlyNo fixed date

The Netherlands in detail

What the national rules say, with the legal texts.

The Netherlands restricts where new hyperscale data centres can be built. An instruction rule added to the Besluit kwaliteit leefomgeving by a decree of 20 December 2023, Staatsblad 2023, 492, prevents Dutch municipalities from accommodating new hyperscale data centres in their environment plans, except in two designated areas: part of the municipality of Het Hogeland in Groningen, and the Agriport locations in Hollands Kroon, Noord-Holland. A hyperscale data centre here is one with a built floor area of more than 10 hectares and an electrical connection capacity of 70 MW or more; both must be met (Bkl article 5.161ba). The rule has applied since 1 January 2024. On 31 August 2026 the government said a tightening of the criteria is being explored within a national data-centre approach due this autumn; no legal proposal exists yet. For a site search across borders, our data-centre siting cost map ranks European countries by modelled electricity cost and carbon emissions.

Dates to watch

The next dates for the Netherlands and the EU, soonest first.

Add these dates to your calendar
  1. 14 Dec 2026The EU Commission's minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database due every year
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

Formal refusals and bans since 2025

Verified decisions only. Absence is not evidence of low planning risk.

Area-wide rules

  1. 23 Jun 2026Oldambt, Groningen Temporary ban on new data centres on business land while the zoning plan is revisedIn force
  2. 26 May 2026Heusden, North Brabant Temporary ban on new data centres, up to 18 months, while the zoning plan is revisedIn force
  3. 12 May 2026Zaanstad, near Amsterdam Zoning plan bars new data centres above 2,000 m² floor area and 5 MVAIn force
  4. 11 Jun 2025Amsterdam Zoning plan bars new or larger data centres above 2,000 m² floor area and 5 MVAIn force

Decisions from 1 Jan 2025; statuses checked 11 Oct 2026.

What changed

Every change to these rules on the tracker, newest first.

  1. 18 Oct 2026Added to the tracker: EED energy management systems, Article 11 (In force as a Directive duty on Member States; deadline not yet reached).
  2. 15 Oct 2026Bkl instruction rule, Staatsblad 2023, 492: next date now Autumn 2026: national integrated data-centre approach, which explores tightening the criteria; no date published (was Ongoing).
  3. 15 Oct 2026Added to the tracker: Bal paragraph 5.4.1a, arts 5.16a to 5.16c (Staatsblad 2024, 122): energy-efficiency data of data centres (EED Art. 12) (In force since 7 May 2024).

Get an alert for the Netherlands

We write to this list when a rule here changes status or a date moves, usually within a week of the change appearing in the log above. Nothing else, and your address is never shared.

See our privacy policy.

Questions

Which rules apply to a data centre in the Netherlands?

Our tracker lists 8 rules for building and running a data centre in the Netherlands, national and EU, and 5 of them are in force.

What is the next date for data centre rules in the Netherlands?

The next date is 14 Dec 2026: the EU Commission's minimum performance standards consultation and call for evidence closes.

From the European data-centre regulation tracker, which cites the legal text for every rule. Data-centre market data for the Netherlands. Grid connection for data centres in the Netherlands.