European data-centre markets, side by side

Frankfurt, Amsterdam, Zurich, Madrid and Helsinki for the same load, or pick up to six of twelve. Power cost, grid carbon, climate for cooling and the rules that apply, each from a named source. Markets only, never individual sites, and no single winner.

Markets, two to six
Your scenario

9,110 MWh a year at the meter

Per marketFrankfurtGermanyAmsterdamNetherlandsZurichSwitzerlandMadridSpainHelsinkiFinland
Power cost
Day-ahead wholesale price, meanEUR per MWh, 1 Oct 2025 to 30 Sep 2026104.05103.03119.1273.2955.78
Wholesale cost for your loada year at a flat load, before network charges, levies, taxes and margin€948k€939k€1.09M€668k€508k
Business price before taxes and leviesEUR per kWh, 2026 first half, band 2,000 to 19,999 MWh0.1382 p0.1445Not in Eurostat0.10470.0842
Business price after taxes and levies a business cannot recoverEUR per kWh, 2026 first half, VAT excluded0.1742 p0.1824Not in Eurostat0.11770.0852
Cost for your load at that pricea year, all consumers in the band, not data centres€1.59M€1.66MNot in Eurostat€1.07M€776k
Grid carbon
Grid carbon intensity, 2025g CO2e per kWh, lifecycle, generation-based3342543915457
Emissions for your loada year, if the load drew the national average3,044 t2,311 t356 t1,398 t521 t
Climate for cooling
Hours a year above 27 °C dry-bulbmean of 2016 to 2025282801681,11735
Hours a year above 32 °C dry-bulbmean of 2016 to 2025518114410
Worst year above 32 °C dry-bulbhours, any of 2016 to 20259524325080
Hours a year above 20 °C wet-bulbmean of 2016 to 2025, limit for evaporative cooling100941206354

Bars compare the markets within one row and do not change with your scenario. p marks a value Eurostat flags as provisional. London has no wholesale series here, so its wholesale cells stay empty rather than borrow another source. Ireland’s wholesale mean covers 99.7% of the 12 months. Zurich and London have no Eurostat series, and Swiss network tariffs are not included yet.

How to read it

Wholesale is not your bill

The day-ahead price leaves out network charges, levies, taxes and the supplier’s margin. The Eurostat rows add them back, for the average business in the 2,000 to 19,999 MWh band, which is not the same as a data centre with its own contract.

Carbon here is a national average

Ember’s 2025 figure is lifecycle emissions of electricity generated in the country, divided by that generation. Imports are not counted, so Switzerland, Finland and the Netherlands are neither charged for what they import nor credited for what they export. It is not market-based and not hourly. The live grid uses a different, production-based method by hour, so do not compare the two.

Climate hours are a screen

Hours above a threshold show how often outside air alone cannot hold that temperature before any approach allowance. They come from ERA5 reanalysis at a 0.25 degree grid cell near each city centre, which smooths urban extremes. Zurich has more hours above 20 °C wet-bulb than Madrid, so a dry-bulb view alone would mislead anyone planning evaporative cooling.

Rules that apply

WhereRuleStatusSource
EU: DE, NL, ES, FIReporting duty from 500 kW installed IT power, 7 items and 24 indicators, next report 15 May 2027In forceDirective (EU) 2023/1791 Art. 12; Delegated Regulation (EU) 2024/1364
EU: DE, NL, ES, FIWaste-heat use above 1 MW total rated energy input, unless a cost-benefit assessment shows it is not feasibleIn forceDirective (EU) 2023/1791 Art. 26(6)
EU: DE, NL, ES, FICommon rating scheme adopted 21 Sep 2026; in Parliament and Council scrutiny, extended 6 OctAdopted, not in forceCommission delegated regulation; see our tracker
GermanyPUE 1.5 or lower from 1 Jul 2027 and 1.3 from 1 Jul 2030 for sites running before 1 Jul 2026; 100% renewable electricity from 1 Jan 2027In forceEnEfG section 11
GermanyBill to relax the PUE limits to 1.6 and 1.4; committee hearing held 5 Oct 2026ProposedDrucksache 21/8027
NetherlandsNew hyperscale data centres restricted nationally to two designated areasIn forceStaatsblad 2023, 492
SpainDraft Royal Decree for sites above 1 MW, including hourly matching with additional renewable generation; consultation closed in early September 2026ProposedMinistry for the Ecological Transition (MITECO) announcement, August 2026

Checked 10 October 2026. The regulation tracker holds the detail and the next dates. Not covered yet: Swiss and UK rules (outside the EU, so the EED and the German act do not apply), Finnish data-centre tax treatment, Amsterdam city limits, and grid connection queues, which decide timing in several of these markets.

What this page does not say

  • It does not rank the markets or name a best place for a megawatt. The differences that matter depend on your load, timing and risk.
  • It is not a quote. No row is what a specific data centre pays.
  • It says nothing about individual operators or sites, and nothing about grid capacity or vacancy.

Need your own comparison?

We are testing whether a custom version is worth paying for: your markets, your load and timing, the same sourced dimensions, in a short report. Data and sources only, no site advice.

Status: waiting list only. It does not exist as a service yet and nothing is for sale. Proposed range, by scope: €1,000 to €5,000 per comparison. No payment is taken and joining commits neither side.

Describe your case

The button opens an email to the ScienceShot editorial team with five short questions already written. We use your reply to decide whether to offer this and to write to you about it, and we publish only aggregate counts. This page stores nothing.

Sources and licences

Wholesale: Bundesnetzagentur | SMARD.de, CC BY 4.0, day-ahead prices for DE-LU, NL, CH, FR, IT-North, PL and DK2; Energy-Charts.info, Fraunhofer ISE, day-ahead prices for Spain, Finland, Ireland and Sweden SE3, used with the data owner’s permission; time-weighted mean over the delivery days 1 October 2025 to 30 September 2026. Business prices: Eurostat, Electricity prices for non-household consumers, bi-annual data (DOI 10.2908/NRG_PC_205), band 2,000 to 19,999 MWh, accessed 10 October 2026, dataset updated 9 October 2026; reuse under Commission Decision 2011/833/EU, values as published. Grid carbon: Ember, Yearly electricity data (Europe), CC BY 4.0. Climate: contains modified Copernicus Climate Change Service information [2026]; ERA5 hourly data on single levels, DOI 10.24381/cds.adbb2d47, 2016 to 2025; neither the European Commission nor ECMWF is responsible for any use made of it. The default scenario is 1 MW of IT load, PUE 1.3 and 80% utilisation, which is 9,110 MWh a year at the meter.