Data centres / Romania

Data centres in Romania

Pipeline projects31 permitted or being builtChecked 11 Oct 2026
Wholesale power price109 €/MWhDay-ahead, 2025 mean, RomaniaCalendar year 2025
Grid carbon intensity260 g CO2/kWhYearly average, RomaniaLatest full year
Next EU rule date14 Dec 2026The EU Commission's minimum performance standards consultation and call for evidence closesApplies EU-wide
Business electricity price186 €/MWhNon-household, with network charges and taxesLatest full year

Data checked 11 Oct 2026

On 11 October 2026 our pipeline tracker lists 3 data-centre projects in Romania, and 1 of them is permitted or being built.

Data centres in Romania in October 2026

Our tracker follows 3 data centre projects of 1 MW or more in Romania, 1 of them permitted or being built. 5 developers are behind them.

Largest stated project80 MWDriverAI quantum AI data centre, Luna, planned capacity, four phases of 20 MW each
Newest milestoneSep 2026most recent public step in this market

Projects by stage

  • Announced2
  • Permitted1

What the capacity figures measure

  • IT load1
  • Facility, campus or unstated basis2

Each capacity is on its own stated basis; never added.

Who is building data centres in Romania

  • Danube Solar Seven1 project
  • DriverAI LLC1 project
  • Leviatan Group1 project
  • S+B Gruppe AG1 project
  • SANY Group1 project

A joint venture counts once per partner.

What changed

1 milestone in the last 90 days. The 3 newest:

  1. Sep 2026NIMB data centre Bucharest building permit and power secured for the facility Permitted
  2. May 2026DriverAI quantum AI data centre, Luna developer reports the project is at an advanced stage of preparation after site visits and checks; no permits or construction reported Announced
  3. Apr 2026SANY data centre near Timișoara developer announces plans for a data centre with battery storage near Timișoara and two solar parks at Uivar Announced

Projects

Across Romania 3

ProjectCapacityStage and latest milestoneBasis
NIMB data centre BucharestS+B Gruppe AGPipera, Bucharest, adjacent to Pipera metro station12 MWinstalled power (IT capacity 6.7 MW)3,400 sqm of white space, Tier III designPermitted
Building permit and power secured for the facility, Sep 2026Expected: Operational between September 2027 and March 2028 (developer)
Statedchecked 11 Oct 2026
DriverAI quantum AI data centre, LunaDriverAI LLC with Leviatan Group, E-INFRA and Carstens Consulting GlobalLuna, Cluj County (Leviatan Group industrial and technology park)80 MWplanned capacity, four phases of 20 MW eachPlans are subject to fiscal conditions and a regulatory framework still to be agreed with the Romanian government (developer)Announced
Developer reports the project is at an advanced stage of preparation after site visits and checks; no permits or construction reported, May 2026
Plannedchecked 11 Oct 2026
SANY data centre near TimișoaraSANY Group (through Sany International) with Danube Solar Seven as local implementerNear Timișoara, Timiș County70 MWinstalled power (up to)Part of a package of about EUR 1 billion with a battery storage system and two solar parks at UivarAnnounced
Developer announces plans for a data centre with battery storage near Timișoara and two solar parks at Uivar, Apr 2026
Plannedchecked 11 Oct 2026

Formal refusals and bans since 2025

Verified decisions only.

No formal refusal or ban recorded for Romania; absence is not evidence of low planning risk.

Decisions from 1 Jan 2025; statuses checked 11 Oct 2026. The pattern across Europe: where Europe says no to data centres.

Power and grid in Romania

Over a year, country level

Grid carbon, latest full-year average260 g CO2/kWh20th cleanest of 30 countries; 68% renewable or nuclear
Business electricity price, latest full year186 €/MWh19th cheapest of 26; wholesale is 57% of it
Wholesale power, 2025 average109 €/MWh24th cheapest of 30
Cooling degree days137 a year10-year national mean

Annual averages from the siting cost ranking.

Rules and dates

Next dates

  1. 14 Dec 2026the EU Commission's minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due every year
  3. 11 Oct 2027EU deadline under Article 11 of the Energy Efficiency Directive for a certified energy management system at enterprises above 85 TJ (23.6 GWh) of annual energy consumption

From the European data-centre regulation tracker. Every rule for a data centre in Romania, with alerts

Questions

How many data centre projects are planned in Romania?

On 11 October 2026 our pipeline tracker lists 3 data-centre projects in Romania, and 1 of them is permitted or being built.

Method

Projects of 1 MW or more (or unstated), announced to under construction, not yet fully operating. A metro includes its region.

  • Projects: latest public milestone, with the date checked; every project is in the pipeline tracker.
  • Over a year: national averages, latest full year.

Basis: Filed when an authority has it on record; Stated when only the developer has announced it; Planned when the only figure is a target.

Cite as: ScienceShot, “Data centres in Romania”, https://scienceshot.com/data-centres/romania (checked 11 Oct 2026). © ScienceShot.

Sources, checked 23 October 2026: EUR-Lex (Official Journal of the EU).

ScienceShot dataset, checked 19 Oct 2026.

Cite this page

ScienceShot. (2026). Data Centre Projects in Romania [Data set, checked 19 Oct 2026]. https://scienceshot.com/data-centres/romania

@misc{scienceshot-romania-2026,
  author = {{ScienceShot}},
  title  = {{Data Centre Projects in Romania}},
  year   = {2026},
  note   = {Data set, checked 2026-10-19},
  url    = {https://scienceshot.com/data-centres/romania}
}