The analysis behind step 2 of a data-centre project, newest first.
The articles.
The tools of this step.
Where the reading turns into figures for your own site.
Design
Design
Set the design basis once: the IT load, cooling, redundancy and spec level size every package, split into the long-lead plant you order first and the fit-out, with lead times and order-by dates.
Build your data centreBill of quantities
Bill of quantities
Every item the design needs, with its quantity and specification, a cost range where size-matched public prices pass our threshold, and the vendors that serve the package in your country.
Open the bill of quantitiesTimeline
Build timeline
The programme from pre-application and permits through the grid wait, long-lead delivery and construction to first energisation, phase by phase.
Open the timeline