Step 2 · Build · view 2 of 3

Bill of quantities every line, its cost and its vendors

Every line of the design: quantity, specification, a cost range where public prices allow, and vendors in your country.

Prices checked 19 Oct 202615 packages in the scheduleEquipment supply, excluding VAT

Sign in to save this into your project. One project is free; Premium keeps up to 25 and saves scenarios.

Sign in
Design basisSet on DesignChange it on Design
Project
Spec level

Sets the defaults below; every field stays editable.

Racks and density
Power feeds per rack
Power
UPS redundancy
Battery chemistry
Generator redundancy
Transformer redundancy
Cooling
Room unit redundancy
Chiller redundancy
CDU redundancy
White space distribution
Strip supply
Containment
Cable category
Engineering parameters

The figures the sizing rules divide by. Change them to your design.

The schedule fills in as you change the design. It needs JavaScript; the design basis sets every quantity.

Sustaining capex

Lifecycle replacement

When each part of this design reaches the end of its life, what replacing it costs, and the yearly reserve that pays for it. Below EBITDA in the Plan, apart from routine maintenance.

How the replacement cost is built

ScienceShot calculation.