Data centres / Austria

Data centre projects in Austria

Pipeline projects22 permitted or being builtChecked 10 Oct 2026
New grid connectionsNo pause or capNo rule in force for Austria pauses, rations or conditions themChecked 12 Oct 2026
Wholesale power price99 €/MWhDay-ahead, 2025 mean, AustriaLatest hour €280, 12 Oct 2026, 17:39 UTC
Grid carbon intensity201 g CO2e/kWhLatest hour, estimate; yearly average 11712 Oct 2026, 17:39 UTC
Next EU rule date14 Dec 2026The EU Commission's minimum performance standards consultation and call for evidence closesApplies EU-wide
Latency to nearest major hub7.0 msRound trip, Vienna to FrankfurtMapped fibre route, minimum

As of 12 Oct 2026Cite as: ScienceShot, Austria data-centre market scorecard, October 2026

These are the data-centre projects of 5 MW or more in Austria that our pipeline tracker follows: 2 projects, 2 of them permitted or already being built.

Newest milestoneJul 2026latest check 10 Oct 2026

Projects by stage

  • Under construction2

What the capacity figures measure

  • No capacity published2

Each project’s capacity is quoted on its own stated basis, so the figures are never added together.

What changed

1 milestone in the last 90 days. The newest check was on 10 Oct 2026; each row below shows its own.

  1. Jul 2026Microsoft Cloud Region Austria East, next expansion stage microsoft reports the next expansion stage of the Austria East region nearing completion, one year after the region's launch Under construction
  2. Apr 2026Google data centre Kronstorf groundbreaking for Google's first data centre in Austria Under construction

Projects

Vienna 1

ProjectCapacityStage and latest milestoneChecked
Microsoft Cloud Region Austria East, next expansion stageMicrosoftGreater ViennaNot disclosedregion with three availability zones in Greater Vienna opened about one year before the source; the row covers the next expansion stage onlyUnder construction
Microsoft reports the next expansion stage of the Austria East region nearing completion, one year after the region's launch, Jul 2026
10 Oct 2026

Elsewhere in Austria 1

ProjectCapacityStage and latest milestoneChecked
Google data centre KronstorfGoogleKronstorf, Upper AustriaNot disclosedheise describes the site as about 50 hectaresUnder construction
Groundbreaking for Google's first data centre in Austria, Apr 2026
10 Oct 2026

Formal refusals and bans since 2025

Verified decisions only. Absence is not evidence of low planning risk.

No formal refusal or ban recorded for Austria in this register. The register covers decisions we have verified, not every decision taken.

Decisions from 1 Jan 2025; statuses checked 11 Oct 2026.

Power and grid in Austria

The latest hour, AT bidding zone

Grid carbon intensity (estimate)201 g CO2e/kWhsame hour yesterday 106
Day-ahead price280 €/MWhwholesale, not what a site pays
Renewable share of generation64 %
Best four hours for flexible load11:00Tue 13 Oct to 15:00, local time

Updated 12 Oct 2026, 17:39 UTC; refreshed every 10 minutes. Austria grid hour by hour, next 48 hours

Over a year, country level

Grid carbon, latest full-year average117 g CO2/kWh9th cleanest of 30 countries; 84% renewable or nuclear
Business electricity price, latest full year188 €/MWh20th cheapest of 26; wholesale is 54% of it
Wholesale power, 2025 average99 €/MWh17th cheapest of 30
Cooling degree days34 a year10-year national mean

Annual country averages, as used by the siting cost ranking. Production-based average carbon, not marginal.

Fibre latency from Vienna

ToRound trip, minimumPath lengthPath
Prague2.8 ms286 kmMapped fibre route
Munich3.8 ms385 kmMapped fibre route
Berlin5.9 ms598 kmMapped fibre route
Frankfurt7.0 ms713 kmMapped fibre route
Paris11 ms1,099 kmMapped fibre route
Amsterdam11 ms1,103 kmMapped fibre route
London12 ms1,235 kmStraight line (no mapped land route)
Dublin16 ms1,682 kmStraight line (no mapped land route)

Light in single-mode fibre between city centres, over the mapped land fibre route where one exists, otherwise the straight line. Operator routes, equipment and the last kilometres add to these floors. Any pair in the latency calculator

Rules and dates

Next dates

  1. 14 Dec 2026the EU Commission's minimum performance standards consultation and call for evidence closes
  2. 15 May 2027EU database and French reports due every year

From the European data-centre regulation tracker.

Method

The pipeline covers data-centre projects of 5 MW or more, or with no capacity published, that are announced, in planning, permitted or under construction and not yet fully operating. It is not a list of operating facilities. A metro market follows the tracker’s own market field, so it includes the region around the city; a country page covers every tracked project in the country.

  • Projects: each row is the latest public milestone we found for the project, with the date it was last checked; the pipeline tracker holds every project.
  • Latest hour: carbon intensity estimated from the hourly generation mix, with the day-ahead price, refreshed every 10 minutes on the live grid page.
  • Over a year: national averages for the latest full year, the same figures the siting cost ranking uses.
  • Latency: light in fibre between city centres over the mapped land route, otherwise the straight line.

Cite as: ScienceShot, “Data centre projects in Austria”, https://scienceshot.com/data-centres/austria/ (checked 10 Oct 2026). © ScienceShot. You may quote individual facts with a link to this page.

ScienceShot dataset, checked 12 Oct 2026. How we build it: Method and standards.