Market study
European Data Centre Economics 2026
What capacity sells for, what it costs to build and power, who is buying, and where the next margin sits
268 data points used8 figures30 tables
Documents
Market studies and compliance packs built from ScienceShot’s own datasets. Each has a free sample.
The research editions behind the intelligence dashboard: what European data-centre capacity sells for, what it costs, and what is being built.
Market study
What capacity sells for, what it costs to build and power, who is buying, and where the next margin sits
268 data points used8 figures30 tables
Pipeline report, quarterly
Data-centre projects announced, in planning, permitted or under construction across Europe, by market, with the latest milestone of every project
358 projects30 markets6 figures
An intelligence dashboard built on this data is in preparation. Join the waiting list
EU energy reporting for data centres, worked out for the people who file it.
Reporting pack
Data-centre energy reporting for the 15 May 2027 round
30 tables11 sections
In preparation: the full reporting pack for the 15 May 2027 round, and a compliance tracker for operators with several sites, countries and certifications. Join the waiting list
Nothing is for sale. Joining a waiting list by email commits neither side, and the site stores nothing. Terms of sale
We apply the same method to your numbers.