
EU data centre rating: what the A to G label grades, and when
The Commission's rating act, adopted but not yet in force, would grade only PUE and WUE, A to G. What sets your class, and what goes public.

The Commission's rating act, adopted but not yet in force, would grade only PUE and WUE, A to G. What sets your class, and what goes public.

How an SMR makes power, which designs are licensed, which data-centre deals are signed, and what 100 MW and 1 GW campuses need.

Shifting flexible compute to cleaner hours cuts reported emissions, but the saving depends on country, window and signal. Evidence and a checklist.

The Bundestag hears the EnEfG bill on 5 October. What it changes for data centres and what six statements tell MPs.

Cosmic-ray neutrons are real, but field studies point to hardware defects behind most DRAM faults and the silent core errors operators have traced.

773 sites reported 2025 operations to the EU database at PUE 1.27. Benchmarks by size and country, and why the fall from 1.36 is not a trend.

The EU is consulting on possible performance floors for data centres, not enforcing them. What is being decided, and the evidence operators should submit.

Every EU, German, French, Irish and Dutch data-centre energy rule in one table, with exact thresholds, current status and the next date to act.

Who must report under the EU Energy Efficiency Directive, the 24 indicators, deadlines, what stays confidential, and a worked PUE, WUE, ERF, REF example.

OVHcloud's SBG2 fire traces back to its free-cooling design: the chimney that made it cheap left no sealed room for a gas system to work.